🛠️ Enphase support is currently in open beta
Learn more
Which Enphase systems are compatible?
You can join Amber for Batteries using Amber’s SmartShift technology with the following systems:
- IQ7 Series Microinverters
- IQ8 Series Microinverters
- Mix of IQ7s and IQ8s on same IQ Gateway (with min. IQ Gateway software version 8.3.5228, check software here)
- IQ Battery 5P
- IQ Battery 5P with Flexphase
- IQ Gateway Metered (ENV-S-WM-230) (with min. IQ Gateway software version 8.2.4398)
- IQ System Controller 3 INT
- Any of the above inverters with an Enphase battery
Unsupported Enphase inverters include:
- M Series Microinverters
- Older IQ Gateway models (including Envoy-R, Envoy-S-Standard)
- Sites with ACBs
Note: You will have On/Off solar curtailment without a consumption meter and Load-Following curtailment with a consumption meter.
How do I sign up to Amber for Batteries?
If you haven't already provided the battery details during sign-up for your Amber account, follow these steps via the Amber app:
- Download the Amber app.
- Log into the Amber app using the email and password created on registration.
- Head to the Devices tab at the bottom of the screen.
- Select Enphase as your brand.
-
You will be redirected to the Enphase website and prompted to log in to your monitoring portal
-
Select the device you want Amber to control, agree to the T&Cs and tap "Allow Access".
- You will be redirected to the Amber registration form.
- Unless you see any error messages you are now signed up and we will begin the enrolment process! 🎉
What happens after I sign up?
We've published this guide on the Amber for Batteries Enrolment Process if you want to take a deep dive.
After you've signed up to Amber and submitted your battery details via the website or app, we will check that your site is all set up to join the SmartShift program. This includes making sure that you've officially transferred to Amber as your electricity retailer, that you've got a smart meter installed and that your meter is configured to record solar exports. All this has to happen before we can continue with the battery enrolment.
Checklist to avoid delays during enrolment
Ensure your inverter is online
If you can see live data in your Ephase Enlighten app, then your inverter is online.
Ensure that you're unenrolled from your previous battery optimisation program
If you've previously enrolled your Enphase system with another VPP, ensure that the previous provider has completely released control of your system before signing up to SmartShift.
If you're unsure whether you've previously been enrolled in a VPP, see this article for more info: What to do if you're in a virtual power plant (VPP) before you join Amber (+ clues to tell if you're part of a VPP if you're unsure)
Comments
Article is closed for comments.