Jemena Residential Tariffs — FY2026-27

Follow

Network tariff price components effective 1 July 2026 (ex GST).

A100 — Residential Single Rate

Type: Single flat rate

Comments: Anytime/flat rate. Same price 24/7.

Price ComponentRate
Network fee33.09 c/day
Network Anytime Energy tariff9.49 c/kWh

A100A180 — Residential Single Rate with Off Peak Heating

Type: Single flat rate with controlled load

Comments: Combination of A100 (single rate on the general channel) and A180 (off-peak heating on a dedicated controlled circuit). Note: this combined code does not appear separately in the Jemena network tariff schedule.

Price ComponentRate
Network fee33.09 c/day
Network Anytime Energy tariff9.49 c/kWh
Network Controlled load tariff (off-peak heating)4.25 c/kWh

A180 — Off-peak Heating Only (dedicated circuit)

Type: Controlled load (secondary tariff)

Comments: Secondary tariff for off-peak heating on a dedicated circuit. No network daily supply charge.

Price ComponentRate
Network Controlled load tariff4.25 c/kWh

A130 — Residential Daytime Saver

Type: Time-of-use

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year.

Price ComponentRate
Network fee33.08 c/day
Network Time-of-use tariff - Peak Time18.21 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time4.55 c/kWh

A10E — Residential Export

Type: Two-way (import and export)

Comments: Two-way tariff. Import: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Export: reward for exports 4pm–9pm every day; charge on exports 11am–4pm every day above the threshold of 1 kWh/day (block, totalled across the billing period); all other times 0.00 c/kWh.

Price ComponentRate
Network fee33.15 c/day
Network Time-of-use tariff - Peak Time18.21 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time4.55 c/kWh
Network Time of Export tariff - Export Reward-15.00 c/kWh
Network Time of Export tariff - Export Charge3.00 c/kWh

Charges applying to all Jemena tariffs

Price ComponentRate
Environmental charge (regulated)1.63 c/kWh
Market charge1.05 c/kWh
Amber hedging1.00 c/kWh
Environmental offset (GreenPower)0.73 c/kWh
Metering charge (general supply)18.97 c/day
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.