Energex Business Tariffs — FY2026-27

Follow

Network tariff price components effective 1 July 2026 (ex GST).

8500 — Small Business Flat

Type: Single flat rate

Comments: Default tariff for small business customers (up to 100 MWh per year) with a basic (Type 6) meter. Same price 24/7. Not available to smart meter customers (except within the 12-month grace period after an end-of-life meter replacement).

Price ComponentRate
Network fee134.70 c/day
Network Anytime Energy tariff10.76 c/kWh

6800 — Small Business TOU Energy

Type: Time-of-use

Comments: Default tariff for new and existing small business customers (up to 100 MWh per year) with a smart meter. Peak 5pm–8pm weekdays; Shoulder 1pm–5pm and 8pm–11am weekdays, 1pm–11am weekends; Off-peak 11am–1pm every day. Weekends have no peak window. Same rates all year.

Price ComponentRate
Network fee134.40 c/day
Network Time-of-use tariff - Peak Time26.32 c/kWh
Network Time-of-use tariff - Shoulder Time7.70 c/kWh
Network Time-of-use tariff - Off-peak Time1.63 c/kWh

3800 — Small Business TOU Demand and Energy

Type: Time-of-use with monthly demand charge

Comments: Optional tariff for small business customers (up to 100 MWh per year) with a smart meter. Peak 5pm–8pm weekdays; Shoulder 1pm–5pm and 8pm–11am weekdays, 1pm–11am weekends; Off-peak 11am–1pm every day. Monthly demand charge (kW) based on the single highest 30-minute demand in the 5pm–8pm weekday peak window.

Price ComponentRate
Network fee98.60 c/day
Network Time-of-use tariff - Peak Time2.32 c/kWh
Network Time-of-use tariff - Shoulder Time8.22 c/kWh
Network Time-of-use tariff - Off-peak Time1.63 c/kWh
Network Demand tariff - Peak700.00 c/kW/month

5700 — Small Business Primary Load Control

Type: Controlled load (primary tariff)

Comments: Opt-in primary tariff for eligible small business customers (up to 100 MWh per year). Supply usually available for at least 18 hours in any 24-hour period, controlled by network equipment.

Price ComponentRate
Network fee98.60 c/day
Network Controlled load tariff5.59 c/kWh

7200 — Large TOU Demand and Energy

Type: Time-of-use with monthly kVA demand charges

Comments: Default tariff for SAC Large customers (100 MWh or above per year) with a smart meter. Peak 5pm–8pm weekdays; Shoulder 1pm–5pm and 8pm–11am weekdays, 1pm–11am weekends; Off-peak 11am–1pm every day. Monthly demand charges (kVA) based on the single highest 30-minute demand within each demand window.

Price ComponentRate
Network fee925.70 c/day
Network Time-of-use tariff - Peak Time1.88 c/kWh
Network Time-of-use tariff - Shoulder Time2.95 c/kWh
Network Time-of-use tariff - Off-peak Time1.63 c/kWh
Network Demand tariff - Peak1391.30 c/kVA/month
Network Demand tariff - Shoulder367.20 c/kVA/month
Network Demand tariff - Off-peak0.00 c/kVA/month

94300 — Large TOU Energy

Type: Time-of-use

Comments: Optional tariff for smart meter customers with annual consumption between 100–160 MWh and monthly peak demand greater than 120 kVA; eligibility reviewed annually. Peak 5pm–8pm weekdays; Shoulder 1pm–5pm and 8pm–11am weekdays, 1pm–11am weekends; Off-peak 11am–1pm every day.

Price ComponentRate
Network fee790.00 c/day
Network Time-of-use tariff - Peak Time25.88 c/kWh
Network Time-of-use tariff - Shoulder Time19.54 c/kWh
Network Time-of-use tariff - Off-peak Time1.63 c/kWh

5800 — Large Business Primary Load Control

Type: Controlled load (primary tariff)

Comments: Opt-in primary tariff for SAC Large customers (100 MWh or above per year). Supply usually available for at least 18 hours in any 24-hour period, controlled by network equipment.

Price ComponentRate
Network fee925.70 c/day
Network Controlled load tariff6.99 c/kWh

5900 — Large Business Secondary Load Control

Type: Controlled load (secondary tariff)

Comments: Secondary tariff for SAC Large customers (100 MWh or above per year) where the total connected load is controlled by network equipment. Supply usually available for at least 18 hours in any 24-hour period. No network daily supply charge.

Price ComponentRate
Network Controlled load tariff6.99 c/kWh

9000 — Controlled Load 1 (Super Economy)

Type: Controlled load (secondary tariff)

Comments: Secondary tariff used alongside a primary residential or small business tariff. Supply usually available for at least 8 hours in any 24-hour period, controlled by network equipment.

Price ComponentRate
Network Controlled load tariff2.68 c/kWh

9100 — Controlled Load 2 (Economy)

Type: Controlled load (secondary tariff)

Comments: Secondary tariff used alongside a primary residential or small business tariff. Supply usually available for at least 16 hours in any 24-hour period, controlled by network equipment.

Price ComponentRate
Network Controlled load tariff2.68 c/kWh

Charges applying to all Energex tariffs

Price ComponentRate
Environmental charge (regulated)0.58 c/kWh
Market charge0.98 c/kWh
Amber hedging1.00 c/kWh
Environmental offset (GreenPower)0.73 c/kWh
Metering charge (general supply)34.26 c/day
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.