AusNet Services Residential Tariffs — FY2026-27

Follow

Network tariff price components effective 1 July 2026 (ex GST).

NASS11 — Small Residential Time of Use

Type: Time-of-use

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time26.96 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time5.33 c/kWh

NASS11S — Small Residential Time of Use Standard Feed In

Type: Time-of-use

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year. Standard feed-in variant — same price components as the base tariff.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time26.96 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time5.33 c/kWh

NAST17 — Small Residential Time of Use & Dedicated Circuit 24 Hour

Type: Time-of-use with controlled load

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year. Includes a dedicated circuit (controlled load) channel with 24-hour supply.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time26.96 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time5.33 c/kWh
Network Controlled load tariff (dedicated circuit)4.90 c/kWh

RCER11 — Residential CER

Type: Two-way (import and export)

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year. Export: reward for exports 4pm–9pm every day; charge on exports 11am–4pm every day above the threshold of 1 kWh/day (rollover, totalled across the billing period).

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time26.96 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time5.33 c/kWh
Network Time of Export tariff - Export Reward-10.00 c/kWh
Network Time of Export tariff - Export Charge1.00 c/kWh

NAST16T — EV Dynamic

Type: Time-of-use

Comments: Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year. EV dynamic trial tariff. Note: this tariff does not appear in the AusNet pricing proposal schedule.

Price ComponentRate
Network fee40.22 c/day
Network Time-of-use tariff - Peak Time28.94 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time5.76 c/kWh

NSP20 — Small Interval Meter Time of Use

Type: Time-of-use

Comments: Seasonal. Summer (Dec–Mar) weekdays and public holidays: Peak 2pm–6pm, Shoulder 12pm–2pm and 6pm–8pm, Off-peak all other times. Winter (Jun–Aug) weekdays and public holidays: Peak 4pm–8pm, Off-peak all other times. Weekends and the shoulder months (Apr–May, Sep–Nov) are all off-peak.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time (Summer)47.80 c/kWh
Network Time-of-use tariff - Shoulder Time (Summer)42.26 c/kWh
Network Time-of-use tariff - Peak Time (Winter)37.41 c/kWh
Network Time-of-use tariff - Off-peak Time4.84 c/kWh

NSP23 — Small Interval Meter Time of Use Solar Installation Standard Feed In

Type: Time-of-use

Comments: Seasonal. Summer (Dec–Mar) weekdays and public holidays: Peak 2pm–6pm, Shoulder 12pm–2pm and 6pm–8pm, Off-peak all other times. Winter (Jun–Aug) weekdays and public holidays: Peak 4pm–8pm, Off-peak all other times. Weekends and the shoulder months (Apr–May, Sep–Nov) are all off-peak. Standard feed-in variant — same price components as the base tariff.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time (Summer)47.80 c/kWh
Network Time-of-use tariff - Shoulder Time (Summer)42.26 c/kWh
Network Time-of-use tariff - Peak Time (Winter)37.41 c/kWh
Network Time-of-use tariff - Off-peak Time4.84 c/kWh

NEE11 — Small Single Rate

Type: Block

Comments: Usage billed in blocks with a 4,080 kWh threshold — both blocks are currently priced the same.

Price ComponentRate
Network fee39.81 c/day
Network Block tariff - Block 1 (first 4,080 kWh)13.43 c/kWh
Network Block tariff - Block 2 (above 4,080 kWh)13.43 c/kWh

NEE11S — Small Single Rate Standard Feed In

Type: Block

Comments: Usage billed in blocks with a 4,080 kWh threshold — both blocks are currently priced the same. Standard feed-in variant — same price components as the base tariff.

Price ComponentRate
Network fee39.81 c/day
Network Block tariff - Block 1 (first 4,080 kWh)13.43 c/kWh
Network Block tariff - Block 2 (above 4,080 kWh)13.43 c/kWh

NEE19 — Small Single Rate & Dedicated Circuit 24 Hour

Type: Block with controlled load

Comments: Usage billed in blocks with a 4,080 kWh threshold — both blocks are currently priced the same. Includes a dedicated circuit (controlled load) channel with 24-hour supply.

Price ComponentRate
Network fee39.81 c/day
Network Block tariff - Block 1 (first 4,080 kWh)13.43 c/kWh
Network Block tariff - Block 2 (above 4,080 kWh)13.43 c/kWh
Network Controlled load tariff (dedicated circuit)4.90 c/kWh

NEE24 — Small Two Rate 8:00 to 8:00

Type: Time-of-use

Comments: Peak 8am–8pm weekdays and public holidays; Off-peak all other times. Weekends are all off-peak.

Price ComponentRate
Network fee39.81 c/day
Network Time-of-use tariff - Peak Time12.05 c/kWh
Network Time-of-use tariff - Off-peak Time4.68 c/kWh

E1 — Fake Reference Tariff

Type: Single flat rate

Comments: Internal reference tariff. Anytime/flat rate. Note: this code does not appear in the AusNet pricing proposal schedule — confirm whether it should be published.

Price ComponentRate
Network fee39.81 c/day
Network Anytime Energy tariff13.43 c/kWh

NEE30 — Small Dedicated Circuit

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a dedicated circuit (e.g. hot water).

Price ComponentRate
Network Controlled load tariff4.90 c/kWh

NEE31 — Small Dedicated Circuit with Afternoon Boost

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a dedicated circuit with an afternoon boost window.

Price ComponentRate
Network Controlled load tariff4.90 c/kWh

NEE32 — Small Dedicated Circuit 8:00 to 8:00

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a dedicated circuit, supplied 8:00pm to 8:00am.

Price ComponentRate
Network Controlled load tariff4.90 c/kWh

NEE33 — Small Dedicated Circuit 24 Hour

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a dedicated circuit with 24-hour supply.

Price ComponentRate
Network Controlled load tariff4.90 c/kWh

Charges applying to all AusNet Services tariffs

Price ComponentRate
Environmental charge (regulated)1.63 c/kWh
Market charge1.05 c/kWh
Amber hedging1.00 c/kWh
Environmental offset (GreenPower)0.73 c/kWh
Metering charge (general supply)13.98 c/day
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.