CitiPower Residential Tariffs — FY2026-27

Follow

Network tariff price components effective 1 July 2026 (ex GST).

CRSTOU — Residential TOU

Type: Time-of-use

Comments: Default residential tariff for greenfield new connections, new or upgraded solar or battery installations, three-phase upgrades and customers with a smart meter. Peak 4pm–9pm every day; Solar Sponge 11am–4pm every day; Off-peak all other times. Same rates all year. Requires an active interval meter.

Price ComponentRate
Network fee31.51 c/day
Network Time-of-use tariff - Peak Time19.76 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time4.95 c/kWh

CRCER — Residential CER

Type: Two-way (import and export)

Comments: Opt-in two-way tariff for solar, battery and EV customers. Import (seasonal): Peak 4pm–9pm every day in summer (Dec–Feb) and winter (Jun–Aug); Shoulder 4pm–9pm every day in the other months (Mar–May, Sep–Nov); Solar Sponge 11am–4pm every day; Off-peak all other times. Export: reward for exports 4pm–9pm every day in summer and winter; charge on exports 11am–4pm every day in summer and the shoulder months (no export charge in winter). Basic Export Level: 1 kWh/day exempt from the export charge, totalled across the billing period. All other times 0.00 c/kWh.

Price ComponentRate
Network fee31.51 c/day
Network Time-of-use tariff - Peak Time (Summer/Winter)27.81 c/kWh
Network Time-of-use tariff - Shoulder Time (Mar–May, Sep–Nov)19.33 c/kWh
Network Time-of-use tariff - Solar Sponge Time1.00 c/kWh
Network Time-of-use tariff - Off-peak Time3.27 c/kWh
Network Time of Export tariff - Export Reward (Summer/Winter)-7.00 c/kWh
Network Time of Export tariff - Export Charge1.00 c/kWh

C1R — Residential Single Rate

Type: Single flat rate

Comments: Anytime/flat rate, opt-in. Same price 24/7.

Price ComponentRate
Network fee31.51 c/day
Network Anytime Energy tariff9.09 c/kWh

CDS — Residential Dedicated Circuit

Type: Controlled load (secondary tariff)

Comments: Opt-in secondary tariff for a time-switched circuit — hot water (single-phase, under 30 amps) or slab heating, typically switched overnight with a possible afternoon boost in winter. No network daily supply charge.

Price ComponentRate
Network Controlled load tariff1.00 c/kWh

Charges applying to all CitiPower tariffs

Price ComponentRate
Environmental charge (regulated)1.63 c/kWh
Market charge1.05 c/kWh
Amber hedging1.00 c/kWh
Environmental offset (GreenPower)0.73 c/kWh
Metering charge (general supply)15.20 c/day
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.