Ausgrid Residential Tariffs — FY2026-27

Follow

Network tariff price components effective 1 July 2026 (ex GST).

EA025 — Residential ToU

Type: Time-of-use

Comments: Seasonal — peak applies in summer (Nov–Mar) and winter (Jun–Aug) only; in the shoulder months (Apr–May and Sep–Oct) all usage is off-peak. Peak 3pm–9pm every day (in peak seasons); Off-peak all other times.

Price ComponentRate
Network fee63.23 c/day
Network Time-of-use tariff - Peak Time (Summer/Winter)32.52 c/kWh
Network Time-of-use tariff - Off-peak Time5.36 c/kWh

EA010 — Residential Flat

Type: Single flat rate

Comments: Closed tariff — not available to new customers, per the Ausgrid price list. Anytime/flat rate. Same price 24/7.

Price ComponentRate
Network fee50.86 c/day
Network Anytime Energy tariff12.70 c/kWh

EA111 — Residential Demand (Introductory)

Type: Flat rate with daily demand charge

Comments: Introductory demand tariff with a nominal demand price. Anytime energy rate. Daily demand charge (kW) based on the highest 30-minute demand 3pm–9pm all days, applying in summer (Nov–Mar) and winter (Jun–Aug) only.

Price ComponentRate
Network fee57.29 c/day
Network Anytime Energy tariff11.80 c/kWh
Network Demand tariff - Peak (Summer/Winter)1.46 c/kW/day

EA116 — Residential Demand

Type: Flat rate with daily demand charge

Comments: Anytime energy rate. Daily demand charge (kW) based on the highest 30-minute demand 3pm–9pm all days, applying in summer (Nov–Mar) and winter (Jun–Aug) only.

Price ComponentRate
Network fee67.01 c/day
Network Anytime Energy tariff2.81 c/kWh
Network Demand tariff - Peak (Summer/Winter)39.49 c/kW/day

EA029 — Small Customer Export Tariff

Type: Export (feed-in)

Comments: Two-way export tariff for small customers. Pays a reward for exports 4pm–9pm every day; applies a charge on exports 10am–3pm every day. Export threshold: 6.85 kWh/day (block, totalled across the billing period). All other times 0.00 c/kWh.

Price ComponentRate
Network Time of Export tariff - Export Reward-3.86 c/kWh
Network Time of Export tariff - Export Charge1.23 c/kWh

EA030 — Controlled Load 1

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a controlled circuit.

Price ComponentRate
Network fee4.04 c/day
Network Controlled load tariff2.97 c/kWh

EA040 — Controlled Load 2

Type: Controlled load (secondary tariff)

Comments: Secondary tariff on a controlled circuit, with longer supply availability than Controlled Load 1.

Price ComponentRate
Network fee7.59 c/day
Network Controlled load tariff5.62 c/kWh

Charges applying to all Ausgrid tariffs

Price ComponentRate
Environmental charge (regulated)1.01 c/kWh
Market charge0.96 c/kWh
Amber hedging1.00 c/kWh
Environmental offset (GreenPower)0.73 c/kWh
Metering charge (general supply)42.95 c/day
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.